Archive - May 29, 2010

Date
  • All
  • Jan
  • Feb
  • Mar
  • Apr
  • May
  • Jun
  • Jul
  • Aug
  • Sep
  • Oct
  • Nov
  • Dec
  • All
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
John's picture

Progress

Today I started by redoing some of the connections from yesterday of the battery bank.  I also put on some stabilizers.  I built a 3 channel 6/6/6 gauge wiring harness to carry power from port to starboard and drilled the holes and put it in.  A new fuse panel on the starboard side on our wall of panels hosts connections for the fridge, a power outlet and a distribution box.  The distribution box is located in the bathroom and can distribute to any switched low-watt DC stuff.  Currently it is connected to two new vents (removed our vent stacks and put on some nice powered vent caps).  All in all, a very productive day.